-->

Foundations

Application

Mix 1

Mix 2

Blinding and mass concrete fill

GEN1

 C10 

Strip footings (non-aggressive soils)

GEN3

C20

Mass concrete foundations (non-aggressive soils, i.e. Class 1 sulphate conditions)

GEN3

C20

Trench fill foundations (non-aggressive soils)

GEN3

C20

Reinforced foundations in Class 1 suplhate conditions

 RC35

 N/A

Foundations in Class 2 sulphate conditions

 FND2

 N/A

 Foundations in Class 3 sulphate conditions

 FND3

 N/A

Mix 1 = Designated Concretes are quality assured concretes that conform to a specification detailed in BS 8500.

Mix 2 = Strength Concretes will reach their desired strength in newtons after 28 days. e.g. C25 gives 25 Newton strength.